logo

Found 123 Products For "0 5ms powder coating lines"

کیفیت غرفه اسپری پرده پیش فرض اتوماتیک غرق کارخانه

غرفه اسپری پرده پیش فرض اتوماتیک غرق

Automatic Painting Cabinet with Water Curtain Project in Machine Factory Paint production line Product Application This is the painting Production line use in some Industrial equipments,do the cusotmied design according workshop space,producing capacity require and paint process detail requirement. It starts with the distribution center equipped with five buffer spaces and a heavy-duty transfer platform , which handles the distribution of trailers and wagons on demand. The

کیفیت غرفه اسپری پرده دستی زیرزمینی استیل کارخانه

غرفه اسپری پرده دستی زیرزمینی استیل

Auto/Manual Spray Painting Booth/Water Curtain Cabinet with Best Price Product Application This is the painting Production line use in some Industrial equipments,do the cusotmied design according workshop space,producing capacity require and paint process detail requirement. Maint Process 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed-circuit conveyor, power and free conveyor, overhead open

کیفیت فر برای پخت غرفه نقاشی کانتینر غرفه اسپری صنعتی کامل کارخانه

فر برای پخت غرفه نقاشی کانتینر غرفه اسپری صنعتی کامل

Spray Booth for Container Painting Booth and Baking Oven Line Simple working platform Maint Process: 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed-circuit conveyor, power and free conveyor, overhead open conveyor, and so on 3 Oven: batch oven, hot air circulating drying oven, tunnel oven, bridge drying oven 4 Spray paint room type :Water spray paint room; Water spray paint room; Dry spray

کیفیت غرفه اسپری کانتینر با تجهیزات درمان VOCs اتاق طراحی و طراحی رنگ را طراحی کنید کارخانه

غرفه اسپری کانتینر با تجهیزات درمان VOCs اتاق طراحی و طراحی رنگ را طراحی کنید

Container Paint Room Production Paint Line Photooxygen environmental protection system Maint Process: 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed-circuit conveyor, power and free conveyor, overhead open conveyor, and so on 3 Oven: batch oven, hot air circulating drying oven, tunnel oven, bridge drying oven 4 Spray paint room type :Water spray paint room; Water spray paint room; Dry spray

کیفیت اتاق نقاشی اتومبیل Pre Treament Robot Steel Iron CE TUV کارخانه

اتاق نقاشی اتومبیل Pre Treament Robot Steel Iron CE TUV

Robot Paint Control in Passenger car Painting Production Line Customied Automatic System Quick Details: 1. Project in Wuhan for the painting line about Passenger car 2. Robot painting system 3. Automatic floor Chain system Maint Process 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed-circuit conveyor, power and free conveyor, overhead open conveyor, and so on 3 Oven: batch oven, hot air

کیفیت غرفه های اسپری غرفه رنگ آمیزی برای تجهیزات بخش راه آهن کارخانه

غرفه های اسپری غرفه رنگ آمیزی برای تجهیزات بخش راه آهن

Train Paint Booth China Spray booths for the Railway Sector Equipments Quick Detail: 1. It’s a Big Paint Room for Train,including sanding,painting,oven 2. Painting the top,sides and bottom by manual or robot 3. Drive throught production line 4. Good ventilation with Fan 5. Diesel or Gas Heat system 6. Side Exhaust or pit the ground How to choose coating equipment 1. The size and weight of workpiece,especially the max size and weight 2. Is there any requirements about the

کیفیت Subway Spray Booth Train Paint Booth Railway تجهیزات راه آهن نقاشی کارخانه

Subway Spray Booth Train Paint Booth Railway تجهیزات راه آهن نقاشی

Subway Spray Booth Train Paint Booth Railway Equipments Painting Quick Detail: 1. It’s a Big Paint Room for Train,including sanding,painting,oven 2. Painting the top,sides and bottom by manual or robot 3. Drive throught production line 4. Good ventilation with Fan 5. Diesel or Gas Heat system 6. Side Exhaust or pit the ground How to choose coating equipment 1. The size and weight of workpiece,especially the max size and weight 2. Is there any requirements about the suspension

کیفیت غرفه رنگ آمیزی با پلت فرم 3D بالابر کار تجهیزات راه آهن راه حل رنگ کارخانه

غرفه رنگ آمیزی با پلت فرم 3D بالابر کار تجهیزات راه آهن راه حل رنگ

Train Paint Booth With 3D Lifting Working Platform Railway Equipments Paint Solution Quick Detail: 1. It’s a Big Paint Room for Train,including sanding,painting,oven 2. Painting the top,sides and bottom by manual or robot 3. Drive throught production line 4. Good ventilation with Fan 5. Diesel or Gas Heat system 6. Side Exhaust or pit the ground How to choose coating equipment 1. The size and weight of workpiece,especially the max size and weight 2. Is there any requirements

کیفیت سکوی کاری Man Lift برای راه حل های رنگ قطار Spray Booth Subway کارخانه

سکوی کاری Man Lift برای راه حل های رنگ قطار Spray Booth Subway

Man Lift Working Platform for Train Spray Booth Subway Paint Solutions Quick Detail: 1. It’s a Big Paint Room for Train,including sanding,painting,oven 2. Painting the top,sides and bottom by manual or robot 3. Drive throught production line 4. Good ventilation with Fan 5. Diesel or Gas Heat system 6. Side Exhaust or pit the ground How to choose coating equipment 1. The size and weight of workpiece,especially the max size and weight 2. Is there any requirements about the