logo

غرفه رنگ آمیزی برج های توربین بادی

کیفیت هواپیما PU دیوار 10 میکرون غرفه اسپری صنعتی با بالابر کار کارخانه

هواپیما PU دیوار 10 میکرون غرفه اسپری صنعتی با بالابر کار

Cusotmied Paint Booth with working lift Industrial Display Booth for aircraft painting industrial Spray Booth Components There are four main components that can be found in an industrial spray booth: the working chamber and exhaust, intake, air make-up, and accessories. First, the working chamber is where the spray operation is performed. Second, the exhaust filtration takes the air from the working chamber and filters it out through the exhaust chamber. Some spray booths
کیفیت تجهیزات اسپری نظامی درب های محکم اسپری صنعتی را برای نقاشی هواپیما جمع کنید کارخانه

تجهیزات اسپری نظامی درب های محکم اسپری صنعتی را برای نقاشی هواپیما جمع کنید

Industry Spray Booth /Paint Booth with Ce Project in Military Industry Factory Inner dimension 15000×5000×5000mm(L×W×H). external dimension 15144×6896×5600mm(L×W×H). basement 2 basements.single one size:13000×840 mm(L×W) front door Side opening door,4 doors,4000×4500 mm(W×H),color:white operation door 2 doors,700×2000mm(W×H),color:white wall 3 Steel reinforcements in the wallboard,3 Steel composite beams in roof.wallboard thickness:70mm,width:1150mm,filled with EPS.two color
کیفیت تیغه باد TUV خط تولید نقاشی الکترواستاتیک توسط سیستم اگزوز هوا کارخانه

تیغه باد TUV خط تولید نقاشی الکترواستاتیک توسط سیستم اگزوز هوا

Quality Air Exhaust system for Wind Blade Painting Production Line Equipments Turnkey Project Sales market and Service: We are the Biggest authorised Equipment Supplier of 36 Car brands 4S Shop in China, such as Volkswagen, Audi, Mazda, Citroen, Peugeot, Honda, Toyota, BWB, Ford and Nissan ect. We also export to more than 80 coutries all over the world, such as the USA, Japan, Russia, Australia, Canada, Germany, Korea, Thailand, Malaysia, Singapore, Vietnam, Pakistan, UEA ect
کیفیت تیغه باد بلند غرفه اسپری 2.5 متر خط پوشش اسپری حداقل کارخانه

تیغه باد بلند غرفه اسپری 2.5 متر خط پوشش اسپری حداقل

Long Spray booth in Wind Blade Painting Production Line Equipments Turnkey Project Quick Details: 1. It is a turnkey Project in Wind Blade Painting line in Yangzhou 2. Spray booth with Side Exhaust ventilation system 3. PLC Smart Control System 4. Room Connection Design to save workshop space 5. Manlift inside the booth Maint Process 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed-circuit
کیفیت کنترل پنل بزرگ Ce 30min خط خودکار پوشش اسپری را تنظیم کنید کارخانه

کنترل پنل بزرگ Ce 30min خط خودکار پوشش اسپری را تنظیم کنید

Big Control Panel with PLC for Wind Blade Painting Production Line Equipments Turnkey Project Maint Process 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed-circuit conveyor, power and free conveyor, overhead open conveyor, and so on 3 Oven: batch oven, hot air circulating drying oven, tunnel oven, bridge drying oven 4 Spray paint room type :Water spray paint room; Water spray paint room; Dry
کیفیت خط تولید نقاشی الکتروفورز رباتیک غرفه اتصال کارخانه

خط تولید نقاشی الکتروفورز رباتیک غرفه اتصال

Connection Booth for Wind Blade Painting Production Line Equipments Turnkey Project Maint Process 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed-circuit conveyor, power and free conveyor, overhead open conveyor, and so on 3 Oven: batch oven, hot air circulating drying oven, tunnel oven, bridge drying oven 4 Spray paint room type :Water spray paint room; Water spray paint room; Dry spray paint
کیفیت اجاق گاز تونل فلزی دو لایه 30 متری خط تولید نقاشی کارخانه

اجاق گاز تونل فلزی دو لایه 30 متری خط تولید نقاشی

Double Layer Fans Supporting for Wind Blade Painting Production Line Equipments Turnkey Project How to choose coating equipment 1. The size and weight of workpiece,especially the max size and weight 2. Is there any requirements about the suspension of the workpiece? 3. The material of the workpiece 4. The anticipative output for the biggest size of the workpiece(how many pcs in 8 hours) 5. The length,width and height of the factory available for the powder coating line 6. The
کیفیت مانلیفت ضد آب در خط تولید نقاشی کارخانه

مانلیفت ضد آب در خط تولید نقاشی

Manlift Inside Paint room for Wind Blade Painting Production Line Equipments Turnkey Project Quick Details: 1. It is a turnkey Project in Wind Blade Painting line in Yangzhou 2. Spray booth with Side Exhaust ventilation system 3. PLC Smart Control System 4. Room Connection Design to save workshop space 5. Manlift inside the booth Maint Process 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed
کیفیت خط تولید نقاشی فولادی 10 آمپر با پره باد سیستم اگزوز جانبی کارخانه

خط تولید نقاشی فولادی 10 آمپر با پره باد سیستم اگزوز جانبی

Side Exhaust System Wind Blade Painting Production Line Equipments Turnkey Project Maint Process 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed-circuit conveyor, power and free conveyor, overhead open conveyor, and so on 3 Oven: batch oven, hot air circulating drying oven, tunnel oven, bridge drying oven 4 Spray paint room type :Water spray paint room; Water spray paint room; Dry spray paint